2D / DOCUMENTATION / SINGAPORE
Shop Drawings & Coordinated Documentation
Translate agreed model and design information into coordinated drawing packages. SBT supports shop drawings, Combined Services Drawings (CSD) and project-defined CBP / SEM deliverables.
DELIVERY BASIS
Defined information inputsDocumented review criteriaTraceable outputsView deliverables ↓SCOPE / DELIVERY
Prepare drawings that communicate the information required for the intended site or fabrication review. Drawing purpose, status and approval route must remain clear throughout each issue.
KEY OUTPUTS
- Drawing package
- Drawing and revision register
- Comment response record
- Interface and query schedule
Project context
Prepare drawings that communicate the information required for the intended site or fabrication review. Drawing purpose, status and approval route must remain clear throughout each issue.
Inputs & requirements
- Current design drawings, coordinated discipline models, specifications and previous review comments.
- Drawing register, templates, scales, annotation conventions and required details.
- Project definitions of CSD, CBP and SEM, package boundaries and the named reviewers or approving parties.
Share a non-confidential requirements summary first. Restricted project information should only be exchanged through an agreed secure route.
Technical method
- Confirm drawing purpose, source revisions and outstanding coordination dependencies.
- Prepare the required plans, sections, details, dimensions and annotations from controlled sources.
- Compare model geometry with drawing views, schedules and referenced details.
- Resolve review comments within the agreed scope and issue a documented revision package.
Deliverables
| Output | Purpose |
|---|---|
| Drawing package | Agreed PDF, CAD or model-based documentation with issue status. |
| Drawing and revision register | Sheet references, revisions, issue purpose and related source versions. |
| Comment response record | Responses to review comments and outstanding decisions. |
| Interface and query schedule | Items awaiting coordination, design input or authorised acceptance. |
Review criteria
- Levels, dimensions, annotations and cross-references agree with the intended model revision.
- Openings, service zones and interfaces reflect the recorded coordination decisions.
- Sheet numbering, revision marking and package completeness match the issue register.
Responsibilities
SBT prepares and coordinates documentation. Client, consultant and other authorised parties retain their defined design review and approval responsibilities. CBP and SEM meanings follow the project’s documentation standard; they are not assumed to be interchangeable drawing types.
Common questions
Can drawings be prepared before coordination is complete?
A staged issue may be possible, but unresolved zones and issue purpose must be explicit. A drawing should not imply acceptance of an unchecked interface.
Are shop drawings and design approvals the same service?
No. Drawing preparation and technical or statutory approval are distinct activities with different responsibilities.
PROJECT ENQUIRIES
Discuss Your Project
Tell us your project stage, disciplines and BIM support requirements.
Singapore-based, supporting projects locally and internationally.
Monday–Saturday · 08:00–18:00 SGT Sunday closed
